About this calculator
Estimates mortar quantities for brick or block masonry from a volume-per-area or volume-per-unit consumption rate, split by an editable cement:lime:sand proportion into cement bags, sand, and water.
Formula
base volume = area (m²) × volume per m² (L) [per-area mode]
or unit count × volume per unit (L) [per-unit mode]
total volume (incl. waste) = base volume × (1 + waste% / 100) [finished, wet mortar]
dry volume = total volume × dry volume factor [loose ingredients]
cement volume = dry volume × cement parts / (cement + lime + sand parts)
lime volume = dry volume × lime parts / (cement + lime + sand parts)
sand volume = dry volume − cement volume − lime volume
cement mass = cement volume × cement bulk density
cement bags = ceil(cement mass / bag mass)
sand mass = sand volume × sand bulk density
water volume = total volume × water ratio
The proportion is a proportion of dry, loose volumes. When the mortar is mixed, the cement and lime fill the voids between the sand grains, so the finished mortar takes up much less space than the loose ingredients put into the mixer — roughly the volume of its sand. A 1:3 mix "will still have the same volume as the three volumes of sand you started with" (Building Conservation Directory, Mortar Mix Ratios), which is a factor of 4/3 ≈ 1.33; Indian estimating practice uses 1.27–1.33, and Russian practice (SP 82-101-98) tabulates binder per 1 m³ of sand for the same reason. The default dry volume factor is therefore 133% (the upper end, so cement is not undercounted); it is a practical estimate, not a normative value, and you can change it. Water is still taken as a share of the finished (wet) volume.
The cement:lime:sand proportion is a plain editable ratio (e.g. 1:1:6), not a strength class — EN 998-2 classifies mortar by compressive strength (M2.5, M5, M10...), which depends on the actual materials and testing, not just the mix ratio you enter here.
Worked example
Defaults: 10 m × 2.5 m area, 25 L/m² consumption, 1:1:6 proportion, dry volume factor 133%, 10% waste.
base volume = 25 m² × 25 L/m² = 625 L
total volume incl. waste = 625 × 1.10 = 687.5 L (finished mortar)
dry volume = 687.5 × 1.33 = 914.4 L (loose ingredients)
cement = lime = 914.375 × 1/8 = 114.3 L each; sand = 685.8 L
cement mass = 114.3 L × 1400 kg/m³ = 160.0 kg → ceil(160.0/25) = 7 bags
sand mass = 685.8 L × 1500 kg/m³ = 1028.7 kg
water = 687.5 × 0.18 = 123.75 L
Cross-check for 1 m³ of 1:3 cement mortar: dry volume 1.33 m³, cement 1.33/4 = 0.33 m³ — the same third of a cubic metre the sand-volume rule above gives — or ≈ 466 kg at 1400 kg/m³.
FAQ
Why doesn't the calculator ask for a strength class (M5, M10...)? Strength class depends on the actual materials and site conditions, not just a volume ratio — this calculator only converts a proportion you choose into quantities, it doesn't verify or guarantee a resulting strength class.
Where do "volume per m²" and "volume per unit" come from? They depend heavily on joint thickness and unit size, so they're not something this calculator derives — enter a rate from your mortar manufacturer's data sheet or your own site measurement.
Why is there a dry volume factor? Because 1 m³ of loose cement, lime and sand does not make 1 m³ of mortar — the binder disappears into the voids of the sand. Splitting the finished volume by the ratio (factor 100%) would understate cement and sand by about a quarter.
Why doesn't the calculator cite a standard? EN 998-2 covers mortar strength classification, not a quantity take-off formula or a fixed proportion, so no standard is cited.
Assumptions and limits
Volume-per-area/per-unit consumption, the dry volume factor, bulk densities, cement bag size, and the water ratio are all disclosed estimates you should adjust to match your own product and site conditions.